Enersavings Hub

Thought Leadership at the Forefront
Prime Real Estate

Prime Real Estate needed to implement a custom LED retrofit across its diverse portfolio of buildings to enhance energy efficiency and reduce operational costs.

ADS Canada

ADS Canada’s manufacturing plants were grappling with high energy consumption due to outdated lighting systems that did not meet current energy efficiency regulations.

TSCC Condominium

The TSCC condominium buildings at 2 & 8 Rean Drive needed a Variable Frequency Drive (VFD) installed on a 75 HP cooling tower fan motor to enhance energy efficiency and reduce operational costs.

Crescent School, 2365 Bayview Avenue

Crescent School needed to implement Variable Frequency Drives (VFDs) on several Air Handling Units (AHUs) to boost energy efficiency and lower operational costs.

Diva Condo

Diva Condo sought to expand its charging capabilities in the garage to potentially accommodate up to 100 electric vehicle chargers.

Chrysler Car Dealership

Chrysler was required by their OEM to install EV chargers at their dealership.

Join Our Mailing List

By subscribing, you'll gain insider access to the latest rebate news, cutting-edge industry trends, product updates, special promotions and more!

    Stay Connected With Us

    Head Office

    200 Ronson Drive, Suite 202
    Toronto, ON. M9W 5Z9

    Contact Us

    (+1) 800-874-3470
    info@enersavings.com

    Copyright © 2024 EnerSavings | Privacy Policy | Terms & Conditions